During the month of December the inspection of the reactor vessel internals baffle bolts was successfully performed at Unit 5 of Bugey Nuclear Power Plant, within the framework of the multi-annual contract with EDF. The first such intervention had previously been carried out in Unit 4 of the plant.
Tecnatom has participated with its inspection equipment and inspection and maintenance personnel to the entire satisfaction of the client with the work performed. The contract contemplates 4 inspections of the baffle bolts of the vessel internals at four other French plants during 2011.